Düzce | TURKEY
14.06.2001
14.10.2001
11.854 m²
4.900.000₺ | $4.096.339
488 Housing Units | Disaster Housing
The Düzce 488 Housing | Disaster Housing Project, carried out by the Presidency of the Housing Development Administration under the Ministry of Environment, Urbanization, and Climate Change of the Republic of Turkey, was implemented with the aim of creating safe and permanent living spaces in the aftermath of a disaster.
This project, consisting of a total of 488 housing units, was designed to provide earthquake victims with safe housing. The project, which began on June 14, 2001, was completed on October 14, 2001. With a total investment of 4,900,000₺ (approximately 4.10 million USD), this project made significant contributions to the post-disaster recovery process in Düzce.
Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.
Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.




