Erzurum | TURKEY
29.08.2016
21.09.2018
44.484 m²
94.258.000₺ | $31.903.198
Erzurum 793 Housing Units
As part of the Erzurum 793 Housing Project carried out by the Presidency of the Housing Development Administration under the Ministry of Environment, Urbanization, and Climate Change of the Republic of Turkey, infrastructure and landscaping work has been completed alongside the construction of 793 housing units, with the aim of creating modern and safe living spaces.
Built on a total area of 44,484 m², this project aims to meet the housing needs of the region and improve the quality of life. The project, which began on August 29, 2016, was completed on September 21, 2018. With a total investment of 94,258,000₺ (approximately 31.90 million USD), this project makes a significant contribution to Erzurum’s urban development.
Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.
Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.